WE NEED OBSERVED DATA S OF LIFT IRRIGATION PROJECTS (SUCH AS PVC PIPE LINE WORKS OF VARYING DIA, GI PIPES OF VARYING DIA, SPECIALS OF PVC AND GI , VALVES, ) WITH REFERRING DATA SMODERN INTERIOR DECERATION ITEMS, ACP OF KERALA WATER AUTHORITY, MODERN INTERIOR DECORATION ITEMS, PANELLING, ACP WORKS, STRUCTURAL GLAZING, LAND SCRAPPING AND GARDENING, RUBLE PAVING WORKS, BORE WELL WORKS ETC FOR IMPROVING LSGD EFFICIENCY
prepare the data based on the working procedure at section levels, consolidate the same at district levels and forward the same for approval via EE/SE as the case may be.
Rate for sinking well using laterite staining and concrete staining, Lettering with steel letters and multy wood letters, PVC and ASTM PIPE laying works for WSS with necessary fittings, Texture painting works,tile cladding works,superior quality lipid urinal wash basin (counter top), closets etc, pad lock fitting,Normal PVC Door for toilets,Pipe culvert in Mord, Artistic painting (wall drwings for anganavadies), Ferrocement partitions/shelf etc,groves in plastering, plastering bands,Inauguration stone prepared on granite slab,evegutter using pvc square pipes of different size, sheet roofing using 0.35mm GI trafford sheet, Mangalore patern tile and ridge tile with and without painting, concrete work for road in Mord,Floor traps and gratings,all types CP fittings,Interlocking over 6mm gravel bed for building yards and road work Seperately, Flooring with ceramic rectified tile of size 450x450 and 600x600,Rate for epoxy joint filling in tiling work,floor and wall tiling using gum,
AS per Mord data we are using vibratory compacted paver blocks (M30)are using for road work.It is causing slippage and leading to accidents especially for two wheeler since its surface is smooth.But it can be avoided by providing hydraulically compacted paver blocks(M30) now available in market .The rate of hydraulically compacted paver block is higher than vibratory compacted paver block.So a common observed data is necessary for laying hydraulically compacted paver block.
In circular no. DB/1/3727 /2021/CE/LSGD Dated 05/004/2021 iun serial number 4 please replace the word interlocking with "interlocking or concrete" Also the item to be used for foot path (concrete or intrerlocking ) is also to be included. the observed data for the use of interlocks in road , foot path, etc are to be available in price.
As there is no hard copy of the bitumin bill is now available (only soft copy) from BPCL , Need Clarity regadring the bill to be produced during work bill submission
If the rate in the PRICE software is changed after getting TS and before tendering , is it necessary to recast the estimate before tender?
prepare the data based on the working procedure at section levels, consolidate the same at district levels and forward the same for approval via EE/SE as the case may be. ANY MOVEMENT FOR ADDING NEW ODS TO PRICE, SUBMITTED BY THRISSUR LSGD DIVISION
WE NEED OBSERVED DATA S OF LIFT IRRIGATION PROJECTS (SUCH AS PVC PIPE LINE WORKS OF VARYING DIA, GI PIPES OF VARYING DIA, SPECIALS OF PVC AND GI , VALVES, ) WITH REFERRING DATA SMODERN INTERIOR DECERATION ITEMS, ACP OF KERALA WATER AUTHORITY, MODERN INTERIOR DECORATION ITEMS, PANELLING, ACP WORKS, STRUCTURAL GLAZING, LAND SCRAPPING AND GARDENING, RUBLE PAVING WORKS, BORE WELL WORKS ETC FOR IMPROVING LSGD EFFICIENCY
ReplyDeleteprepare the data based on the working procedure at section levels, consolidate the same at district levels and forward the same for approval via EE/SE as the case may be.
DeleteThis comment has been removed by the author.
ReplyDeleteRate for sinking well using laterite staining and concrete staining, Lettering with steel letters and multy wood letters, PVC and ASTM PIPE laying works for WSS with necessary fittings, Texture painting works,tile cladding works,superior quality lipid urinal wash basin (counter top), closets etc, pad lock fitting,Normal PVC Door for toilets,Pipe culvert in Mord, Artistic painting (wall drwings for anganavadies), Ferrocement partitions/shelf etc,groves in plastering, plastering bands,Inauguration stone prepared on granite slab,evegutter using pvc square pipes of different size, sheet roofing using 0.35mm GI trafford sheet, Mangalore patern tile and ridge tile with and without painting, concrete work for road in Mord,Floor traps and gratings,all types CP fittings,Interlocking over 6mm gravel bed for building yards and road work Seperately, Flooring with ceramic rectified tile of size 450x450 and 600x600,Rate for epoxy joint filling in tiling work,floor and wall tiling using gum,
ReplyDeleteAS per Mord data we are using vibratory compacted paver blocks (M30)are using for road work.It is causing slippage and leading to accidents especially for two wheeler since its surface is smooth.But it can be avoided by providing hydraulically compacted paver blocks(M30) now available in market .The rate of hydraulically compacted paver block is higher than vibratory compacted paver block.So a common observed data is necessary for laying hydraulically compacted paver block.
ReplyDeleteThis comment has been removed by the author.
ReplyDeleteIn circular no. DB/1/3727 /2021/CE/LSGD Dated 05/004/2021 iun serial number 4 please replace the word interlocking with "interlocking or concrete"
ReplyDeleteAlso the item to be used for foot path (concrete or intrerlocking ) is also to be included. the observed data for the use of interlocks in road , foot path, etc are to be available in price.
As there is no hard copy of the bitumin bill is now available (only soft copy) from BPCL , Need Clarity regadring the bill to be produced during work bill submission
If the rate in the PRICE software is changed after getting TS and before tendering , is it necessary to recast the estimate before tender?
Can we use approved OD of other districts, by modifying the LMR rates as per PRICE data?
ReplyDeleteDo we need separate approval for different LMR rates?
prepare the data based on the working procedure at section levels, consolidate the same at district levels and forward the same for approval via EE/SE as the case may be.
ReplyDeleteANY MOVEMENT FOR ADDING NEW ODS TO PRICE, SUBMITTED BY THRISSUR LSGD DIVISION